EU Battery Regulation · EV & industrial

The battery passport for EV batteries.

Reg. (EU) 2023/1542 · Article 77 · mandatory for EV, LMT and >2 kWh industrial batteries placed on the EU market from 18 February 2027.

From 18 February 2027, every EV battery, LMT battery and industrial battery above 2 kWh placed on the EU market must carry a battery passport — a QR-accessible record of composition, carbon footprint, performance and lifecycle data. The date is fixed in law. What is not fixed is how packs, modules and cells stay identifiable through a 10–15 year service life.

Reg. (EU) 2023/1542Article 7718 Feb 2027QR carrier (Art 13)EPCIS 2.0
What the rule requires

What Article 77 actually demands.

A passport per battery

Unique identification with composition, capacity, performance, durability and chemistry data, accessible through the QR code required by Article 13(6) — from 18 February 2027.

A carbon footprint declaration

The passport carries the battery's carbon footprint declaration — production data that must be attributable to the actual battery, not the product family.

Living data, not a nameplate

Annex XIII requires lifecycle telemetry over time — state of health, cycle data, negative events. The passport is a longitudinal record maintained for years, which is a platform obligation, not a label.

Second-life linkage — Art 77(7)

A repurposed battery needs a new passport linked to the passport(s) of the original batteries. Read the plural: module-level genealogy, which pack-level marking alone cannot deliver.

The dates

The timeline, as it stands.

The battery passport is the DPP family's first fixed, unmissable date. Batteries placed on the EU market from 18 February 2027 without a compliant passport do not clear the border.

Regulation in force2023
QR marking (Art 13)18 Feb 2027
Battery passport (Art 77)18 Feb 2027
Second-life linkagewith Art 77
What to do now

Three moves that de-risk the deadline.

01 · Step

Fix identity at pack, module and cell

The regulation marks the pack; the economics live in the modules. Decide now how identity survives disassembly, repurposing and second life.

02 · Step

Stand up the data platform

Carbon footprint, telemetry, custody: passport data accrues over the battery's life. Choose infrastructure that appends events for a decade, not a launch-day PDF.

03 · Step

Prove one battery line end-to-end

Issue live passports for one line and walk them through a simulated border check and a simulated repurposing — before 2027 makes it an emergency.

How Aeroz fits

Pack-level compliance, module-level truth.

Aeroz pairs the required QR with chip-bound identity at pack and module level, resolved through GS1 Digital Link, with every custody and lifecycle event appended to an EPCIS 2.0 log. When a pack is opened for second life, each module still knows who it is — which is exactly what Article 77(7)'s linked-passport requirement assumes and pack-only marking cannot provide.

FAQ

Battery passport for EV, answered.

Which batteries need a passport from February 2027?

EV batteries, light-means-of-transport (LMT) batteries, and industrial batteries above 2 kWh placed on the EU market from 18 February 2027, under Reg. (EU) 2023/1542 Article 77.

What carrier does the battery passport require?

Article 13(6) requires a QR code from 18 February 2027, through which the passport is accessed. The regulation also empowers the Commission to approve alternative smart labels by delegated act — the door for chip carriers.

What is the Article 77(7) second-life problem?

A repurposed battery must carry a new passport linked to the passports of the original batteries it came from. That demands identity below pack level — once a pack is opened, unmarked modules have no provable origin.

Is 99.9% read-rate guaranteed?

No vendor can honestly guarantee a field read-rate. Aeroz builds to a 99.9% read-rate engineering spec at its QC gate and validates real-world performance per deployment during the pilot.

Readiness audit

Know exactly where you stand — in 14 days.

A fixed-fee Aeroz audit maps your products against battery passport for ev requirements and returns a written readiness assessment, a data-mapping review, and a scoped pilot plan with cost and timeline.

Fixed fee 14-day written report No commitment to proceed