Construction products, performance in a passport.
A digital product passport for construction products is the record the revised Construction Products Regulation (EU) 2024/3110 requires, carrying the declaration of performance and conformity, once the Commission's delegated act sets up the system.
The revised Construction Products Regulation, (EU) 2024/3110, has applied since 8 January 2026. It brings a digital product passport for construction products, carrying the declaration of performance and conformity. The passport system itself is set up by a separate Commission delegated act and becomes mandatory 18 months after that act. Until new harmonised specifications arrive, most products still go to market on the old harmonised standards.
DPP for construction products, in three facts.
Reg. (EU) 2024/3110 · in force 7 Jan 2025 · applies 8 Jan 2026 · passport system set by delegated act, mandatory 18 months after it.
The revised Construction Products Regulation (EU) 2024/3110 entered into force on 7 January 2025, and its main part has applied since 8 January 2026.
Source: European Commission, CPR 2024 revisionThe CPR's digital product passport system is set up by a separate Commission delegated act, and the passport becomes mandatory 18 months after it.
Source: DIBt (German Institute for Building Technology), transitional rules under CPR 2024Harmonised standards in force under the 2011 Construction Products Regulation on 8 January 2026 remain valid under the new regulation until they are withdrawn or replaced.
Source: Ireland National Building Control and Market Surveillance Office, CPR 2024 information note
The rule applies now, the passport follows.
The new regulation applies
Most provisions of the revised CPR have applied since 8 January 2026, replacing the 2011 regulation, with transitional rules.
A passport by delegated act
The Commission sets up the passport system by a separate delegated act. The passport becomes mandatory 18 months after it.
Performance and conformity inside
The passport carries the information in the declaration of performance and conformity, product by product family.
Old standards still work
Harmonised standards in force on 8 January 2026 stay valid under the new regulation until they are withdrawn or replaced.
The timeline, as it stands.
The regulation entered into force on 7 January 2025 and applies from 8 January 2026. The passport's own date depends on the delegated act, which is not yet adopted.
Three moves that de-risk the deadline.
Map products to families
New harmonised specifications arrive product family by product family. Know which families yours sit in.
Clean up declarations of performance
The passport is built from the declaration of performance and conformity. Make those accurate and digital now.
Watch the delegated act
Start the 18-month clock when the act is published, not before.
The passport on the pallet and on site.
Construction products change hands from plant to merchant to site. Aeroz binds an identity to each pallet, batch or element that answers a tap with a signed response and links to its declaration of performance, so a contractor or inspector can check what was actually delivered.
DPP for construction products, answered.
Do construction products need a digital product passport?
Yes, under the revised CPR, once the Commission's delegated act sets up the system. The passport becomes mandatory 18 months after that act.
When does the new Construction Products Regulation apply?
Its main provisions have applied since 8 January 2026.
What goes into the construction passport?
The information in the declaration of performance and conformity, and further product information set by delegated acts.
Is this the same passport as ESPR?
It follows the same model as the Ecodesign Regulation's passport, but it is set under the CPR.
Know exactly where you stand, in 14 days.
A fixed-fee Aeroz audit maps your products against the construction products digital product passport under CPR 2024 and returns a written readiness assessment, a data-mapping review, and a scoped pilot plan with cost and timeline.