EU Deforestation Regulation · Coffee

EUDR for coffee.

Reg. (EU) 2023/1115 · large and medium operators from 30 Dec 2026 · micro and small enterprises from 30 Jun 2027.

Coffee placed on the EU market must be deforestation-free and legally produced, backed by a due-diligence statement with geolocation of every production plot. Large and medium operators come into application on 30 December 2026; micro and small enterprises follow on 30 June 2027, under the postponement in Regulation (EU) 2025/2650. For a crop grown by millions of smallholders, the plot-level data requirement is the entire project.

Reg. (EU) 2023/1115GeolocationDue-diligence statementCut-off 31 Dec 2020EPCIS 2.0
What the rule requires

Every bag traces to a mapped plot.

Deforestation-free after the cut-off

Coffee must not come from land deforested after 31 December 2020 — proven, not presumed, for every plot in the supply chain.

Geolocation of every plot

Due diligence includes geolocation coordinates for all plots of land where the coffee was produced — polygon-level for larger plots.

A due-diligence statement per consignment

Operators file a statement in the EU information system before placing product on the market; reference numbers travel with the trade.

Legality in the country of origin

Beyond deforestation: production must comply with the producing country's laws — land rights, labor, environment. Paper claims invite challenge; linked evidence survives it.

The dates

The timeline, as it stands.

The application dates were set back once to allow the system to stand up. They are live now — EU roasters and importers are pushing the data requirement down through traders to origin.

Regulation in forceJun 2023
Large & medium operators30 Dec 2026
Micro & small enterprises30 Jun 2027
Cut-off date for land31 Dec 2020
What to do now

Three moves that de-risk the deadline.

01 · Step

Map plots before contracts

Plot geolocation for smallholder networks is slow, physical work. Start with the cooperatives that feed your largest EU volumes.

02 · Step

Bind bags to plots

The gap in most EUDR programs is between the map and the bag: harvest lots must link to plot polygons at intake, not be reconstructed at export.

03 · Step

Keep the statement chain unbroken

Due-diligence reference numbers must follow the coffee through blending and consolidation. Design the data flow for how coffee actually moves.

How Aeroz fits

From plot polygon to port of Rotterdam.

Aeroz binds identity to coffee at bag or lot level from cooperative intake onward, writing each custody step as an EPCIS 2.0 event linked to plot geolocation and the due-diligence statement. The importer's file stops being a folder of PDFs and becomes a verifiable chain — and shipments routed through the Aeroz Dubai hub can leave for the EU with the evidence already attached.

FAQ

EUDR for coffee, answered.

When does EUDR apply to coffee?

From 30 December 2026 for large and medium operators and traders, and 30 June 2027 for micro and small enterprises — the dates set by Regulation (EU) 2025/2650. Coffee from land deforested after 31 December 2020 cannot be placed on the EU market.

What geolocation data is required?

Coordinates for every plot of land where the coffee was produced — with polygons expected for plots above four hectares. "Region" or "cooperative" level is not sufficient.

How can smallholder coffee comply?

Through mapped cooperative networks: plot registration at the co-op, harvest lots linked to registered plots at intake, and that linkage preserved through processing and export. It is achievable — but only as a data chain, not a certificate.

What happens to non-compliant consignments?

They cannot lawfully be placed on the EU market; member-state authorities can detain product, impose penalties and confiscate revenue. The commercial reality arrives earlier: EU buyers simply stop buying unverifiable origin.

Readiness audit

Know exactly where you stand — in 14 days.

A fixed-fee Aeroz audit maps your products against eudr for coffee requirements and returns a written readiness assessment, a data-mapping review, and a scoped pilot plan with cost and timeline.

Fixed fee 14-day written report No commitment to proceed